Project Scope
MCA Engineering was engaged to design a lowering system to install the PC2-3 Ore Pass.
MCA designed and installed a Chain Jack System. This system built upon a previous design MCA successfully implemented in 2013/2014.
All design and fabrication occurred at the MCA Parkes facility.
Both jobs were a major success with great feedback from the clients. We intend to use the Chain Jack System for many other projects in the future.
Project Downloads
- Download the presentation: Crushed Ore Bin Installation (PDF)
- Download the data sheet: Chain Jack System (PDF)
Work With Us
MCA offer a wide range of services including concept design studies, detailed design, fabrication and construction. For more information, please contact us to discuss how we can assist you with your next project.
Overview
Year: 2022
Client, Project, Location:
Newcrest, Cadia Ore Pass Installation, Cadia East Mine, Orange NSW
Contact Type: Fixed
Role: Subcontract
Contract Value: $2.1 million