Project Scope
The project involved installing four Warman pumps, an overhead crane, and 4 kilometers of 4-inch dewatering piping. The piping was secured to mine walls using pipe brackets and rock bolts installed with MCA Engineering’s 360 Basket.
Work With Us
MCA offer a wide range of services including concept design studies, detailed design, fabrication and construction. For more information, please contact us to discuss how we can assist you with your next project.
Overview
Year: 2014 – 2015
Client, Project, Location:
Ernest Henry Mine, Pump Station, Cloncurry QLD
Contact Type: Fixed Price / Schedule of Rates
Role: Subcontract
Contract Value: $3 million