Project Scope
This was a two-stage project over 2013 and 2014. MCA Engineering came up with a proposal to lower cans in an Ore Pass using a MCA designed Chain Jack System.
This system enabled Cadia to complete the schedule 2 months in earlier than previous ore passes.
The project was a major success with great feedback from the clients. We intend to use the Chain Jack System for many other projects in the future.
Project Downloads
- Download the presentation: Crushed Ore Bin Installation (PDF)
- Download the data sheet: Chain Jack System (PDF)
Work With Us
MCA offer a wide range of services including concept design studies, detailed design, fabrication and construction. For more information, please contact us to discuss how we can assist you with your next project.
Overview
Year: 2013 – 2014
Client, Project, Location:
Newcrest, Cadia Ore Passes, Cadia East Mine, Orange NSW
Contact Type: Fixed
Role: Subcontract
Contract Value: $2.8 million